CMM in Practice:Processes for Executing Software Projects at Infosys
副标题:无
分类号:
ISBN:9787040114027
微信扫一扫,移动浏览光盘
简介
The book includes 15 chapters. Chapter l gives a brief overview of the CMM and describes some organization-level support for processes at Infosys. The remaining chapters focus on project execution and are organized into three parts. Part I (Chapters 2 and 3) deals with processes that are executed before ale project formally commences. Part II (Chapters 4 through 10) deals with project planning activities. Part III (Chapters 11 through 15) examines project execution and termination. Most chapters focus on some key task in a project and have been kept as independent as possible of the other chapters.
目录
preface xi
acknowledgments xv
1 introduction
1 .1 process-based approach for project execution
1 .2 capability maturity model for software
1 .3 processes at infosys
1 .4 summary
part i project initiation
2 proposals and contracts
2.t customer and vendor interaction
2.2 the proposal
2.5 the contract
2.4 summary
3 requirements specification and ma
3.1 requirements analysis and specification
3.2 requirements change management
3.3 traceability management
3.4 example: the war system
.3.5 summary
part ii project planning
4 process definition and tailoring
4.1 development process
4.2 process tailoring
4.9 summary
5 process database and process capability baseline
5.1 software metrics and process management
5.2 process database
5.a process capability baseline
5.4 summary
6 effort estimation and scheduling
6.1 background
6.2 bottom-up estimation
6.3 top-down estimation
6.4 scheduling
6.5 summary
7 quality planning and defect estimation
7.1 quality management
7.2 quantitative quality management planning
7.3 summary
8 risk management
8.1 background
8.2 risk assessment
8.3 risk control
8.4 examples
8.5 summary
9 project management plan
9.1 project management plan
9.2 example: project plan of war 2.0
9.3 summary
10 configuration management
10.1 configuration management concepts
10.2 configuration management process
10.3 document control
10.4 example: configuration management plan of the war project
10.5 summary
part iii project execution and termination
11 life cycle execution
11.1 high-level design
11.2 detailed design
11.3 build
11.4 system testing
11.5 acceptance and installation
11.6 summary
12 peer review
12.1 review process
12.2 data collection
12.3 monitoring and control
12.4 introduction of reviews and the nah syndrome
12.5 summary
13 project monitoring and control
13.1 data collection
13.2 project tracking
l3.3 quantitative monitoring and control
13.4 defect analysis and prevention
l3.5 summary
14 project audits
14.1 audit process
14.2 audit analysis
14.3 summary
15 project closure
15.1 project closure analysis
15.2 archiving
15.3 closure analysis report for war 2.0
15.4 summary
appendix a: from iso 9000 to cmm
appendix b: managing the software process
improvement project
index
acknowledgments xv
1 introduction
1 .1 process-based approach for project execution
1 .2 capability maturity model for software
1 .3 processes at infosys
1 .4 summary
part i project initiation
2 proposals and contracts
2.t customer and vendor interaction
2.2 the proposal
2.5 the contract
2.4 summary
3 requirements specification and ma
3.1 requirements analysis and specification
3.2 requirements change management
3.3 traceability management
3.4 example: the war system
.3.5 summary
part ii project planning
4 process definition and tailoring
4.1 development process
4.2 process tailoring
4.9 summary
5 process database and process capability baseline
5.1 software metrics and process management
5.2 process database
5.a process capability baseline
5.4 summary
6 effort estimation and scheduling
6.1 background
6.2 bottom-up estimation
6.3 top-down estimation
6.4 scheduling
6.5 summary
7 quality planning and defect estimation
7.1 quality management
7.2 quantitative quality management planning
7.3 summary
8 risk management
8.1 background
8.2 risk assessment
8.3 risk control
8.4 examples
8.5 summary
9 project management plan
9.1 project management plan
9.2 example: project plan of war 2.0
9.3 summary
10 configuration management
10.1 configuration management concepts
10.2 configuration management process
10.3 document control
10.4 example: configuration management plan of the war project
10.5 summary
part iii project execution and termination
11 life cycle execution
11.1 high-level design
11.2 detailed design
11.3 build
11.4 system testing
11.5 acceptance and installation
11.6 summary
12 peer review
12.1 review process
12.2 data collection
12.3 monitoring and control
12.4 introduction of reviews and the nah syndrome
12.5 summary
13 project monitoring and control
13.1 data collection
13.2 project tracking
l3.3 quantitative monitoring and control
13.4 defect analysis and prevention
l3.5 summary
14 project audits
14.1 audit process
14.2 audit analysis
14.3 summary
15 project closure
15.1 project closure analysis
15.2 archiving
15.3 closure analysis report for war 2.0
15.4 summary
appendix a: from iso 9000 to cmm
appendix b: managing the software process
improvement project
index
CMM in Practice:Processes for Executing Software Projects at Infosys
- 名称
- 类型
- 大小
光盘服务联系方式: 020-38250260 客服QQ:4006604884
云图客服:
用户发送的提问,这种方式就需要有位在线客服来回答用户的问题,这种 就属于对话式的,问题是这种提问是否需要用户登录才能提问
Video Player
×
Audio Player
×
pdf Player
×